Facilities

 

A completed curtainwall frame coming off the glazing line, being crated before shipping to jobsite.

Quality Control - Glass Inspection:
Checking for defects or flaws in the insulating glass unit prior to glazing.

Prep and Assembly of Terracotta sunshades for the Boston Medical Centre.

Curtainwall frame assembly.

Programming one of our CNC Machining Centres.

Precise cutting of aluminum extrusions.

Quality Control – Layout & Inspection:
Checking to ensure this particular component meets the tolerances required for the project.

Cutting Area.

All curtainwall frames are shrink wrapped prior to shipping to site.

Drafting and Engineering.